Risk and Security Management: Stakeholder Project Failures Illuminated by an IED occurrence at a Hydro-Power Construction Project in Pakistan

Paul James

Abstract


Risk and security management is an important aspect of construction activities, especially in countries where the level of security is challenging. This paper is focused on evaluating the impacts of risk/security measures resulting from stakeholder failures related to explosives mismanagement and security events, over an 18-month period, on a large, complex Dam project in a remote area in Pakistan. In July 2021, an incident occurred that had huge ramifications for the risk/security management of a large dam construction site. A qualitative methodology was utilised, where content analysis was conducted on project documentary evidence and where the research design targeted a closed population of 12 - Engineer supervisors/managers to explore their personal opinions. The outcomes indicated that the Employer, the Engineer, WB group and contractors engage in destructive managerial behaviour considered primarily to reduce project performance and create unsafe project situations that were systemically induced. Further, stakeholders are not managing explosives or the security situation underpinning poor project physical progress, leading to consistent project failure issues.


Full Text:

PDF


DOI: https://doi.org/10.5296/jss.v7i1.20444

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Paul James

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Journal of Safety Studies ISSN 2377-3219

Copyright © Macrothink Institute 

To make sure that you can receive messages from us, please add the 'macrothink.org' domains to your e-mail 'safe list'. If you do not receive e-mail in your 'inbox', please check your 'spam' or 'junk' folder.